IBX Air Systems

Compressed air | Medical grade

Medical air is produced on site, not rented.

We design, install and commission medical grade compressed air systems for hospitals, clinics and laboratories. The facility stops paying a monthly rental and the equipment becomes its own asset.

How we work

  • 01

    Survey and demand calculation

    We visit the facility, measure actual demand and deliver a calculation report. The technical visit is free of charge.

  • 02

    Equipment and complete system

    Generation, drying, filtration, tank, manifolds, alarms and piping. One party responsible for the whole system.

  • 03

    Installation, testing and training

    Connection to the existing network, air quality testing, certificate, drawings and training for the maintenance staff.

Medical grade air plant installed and running in the machine room

Case study

The hospital stops renting its air

Hospital General de Saltillo · Saltillo, Coahuila · 2026

The facility paid an outside supplier for its medical air: a gas contract and tank rental, month after month, owning nothing. Today it produces its own.

Read the full case

Rent or produce: run it with your own numbers

Enter what your facility pays today for rented medical air. The other side shows what producing it on site costs in full: the one-time investment and what it takes to keep it running every year.

$675

The going rate today runs between $625 and $725 per outlet per day.

$1,300,000

This is the only figure that does not come from your invoice. The reference is a system like the one in Saltillo — generation, tank, drying, filtration, control, installation and commissioning. The figure for your facility comes from the survey, and the technical visit is free of charge.

See and adjust the assumptions

The defaults are those of the Saltillo system. If you know your own, change them.

The maintenance policy does not include them, and in medical grade air they account for much of the spend: filters, dryer element, condensate traps, seals. IBX estimates them at 30% of the policy and they get their own line, visible rather than buried in the total. If your facility already has a track record, change it.

Difference over 5 years

$21,987,800

in favour of producing on site

The investment is covered in month 4. From there on only the running cost remains.

What piles up over 5 years, month by monthTwo lines: what piles up paying rent, starting at zero and climbing steadily, and what piles up with your own system, starting at the investment amount and climbing far more slowly. Where they cross, the investment is covered.Year 1Year 2Year 3Year 4Year 5Renting · $24,637,500With IBX · $2,649,700They cross
The calculation, line by line
 RentingWith IBX
Air rental · per year$4,927,500
System investment · one time$1,300,000
Electricity · per year$173,740
Maintenance policy · per year$74,000
Minor spare parts · per year$22,200
First year$4,927,500$1,569,940
Over 5 years$24,637,500$2,649,700

This is an estimate based on the assumptions above, not a quotation. The figure for your facility comes from the on-site survey.

Request the free survey

Reliability that backs up lives.

Tell us about your facility and we will tell you what it needs, with numbers.

Request a quote